Assessment & Evidence

CMMC POA&M Tracker

A well-maintained Plan of Action & Milestones is not just a compliance requirement. It's the document that tells your C3PAO assessor you understand your gaps and have a credible plan to close them. 1TEN auto-populates your POA&M from assessment findings and tracks every item to resolution.

180 Day closeout window post-certification
CA.L2‑3.12.2 Directly satisfies
Auto Populated from requirements
The Problem How It Works What You See Inside POA&M Rules Why 1TEN

A missing POA&M is a finding before your assessment even starts

Most DIB contractors either have no POA&M or have one built in a spreadsheet that doesn't map to their actual CMMC gaps. When a C3PAO assessor asks to review your Plan of Action & Milestones and you produce a generic template with placeholder text, it signals that your compliance program is performative. not operational.

A credible POA&M requires practice-level specificity: which requirement is not met, why, what the interim mitigation is, who owns remediation, and when it will be closed. That data can only come from a live requirements assessment. not a template.

1TEN's POA&M Tracker is directly connected to your Requirements Browser. Every practice marked Not Met automatically generates a POA&M item with the practice ID, description, and SPRS point impact pre-filled. You add the owner, due date, and mitigation. the structure is already there.

How CMMC POA&M tracking works in 1TEN

When you mark a requirement Not Met in the Requirements Browser, a POA&M item is created automatically. Each item captures the weakness description, linked CMMC practice, risk level, point of contact, due date, and current status. The dashboard gives you a real-time count of open, in-progress, closed, and overdue items. so nothing falls through the cracks ahead of your assessment.

Dashboard Requirements Evidence POA&M Reports
1TEN POA&M Tracker showing open findings with owners, due dates, and 180-day remediation timelines
  • * POA&M items auto-created from Not Met requirements. practice ID, description, and SPRS point impact pre-populated
  • * Risk level, point of contact, due date, and interim mitigation captured per item. the exact fields C3PAO assessors review
  • * 180-day countdown tracked from certification date. overdue items escalated automatically so you never miss a closeout deadline
  • * Filter by status, risk level, or domain to prioritize remediation work by SPRS point impact
  • * Closing a POA&M item updates your SPRS score projection in real time. so you can model your certification readiness as you work

SPRS score projection based on your POA&M schedule

The most powerful feature of 1TEN's POA&M module isn't the tracker. it's the score projection. As you assign due dates to open items, the SPRS Score Analysis report calculates your projected score trajectory. You can see exactly what your score will be at certification and what it will reach when all items close.

POA&M Tracker: Live Interface HTML source coming

The Remediation Priority table shows every Not Met practice ranked by SPRS point deduction. so your team knows exactly which gaps to close first for the highest score recovery. Each item links directly back to its POA&M entry and requirements assessment.

What the rules say about CMMC POA&M items

Not every open requirement can be deferred to a POA&M. Under CMMC Level 2 assessment rules, specific categories must be fully implemented at the time of assessment. attempting to carry them as POA&M items will result in a conditional or failed assessment.

Critical Rule
5-point requirements and requirements directly related to CUI protection cannot be deferred to a POA&M. they must be fully implemented before your C3PAO assessment begins. 1TEN flags these automatically so you know what must be closed before scheduling.
POA&M Category Can Be Deferred? Notes
1-point requirements Yes. with conditions Must close within 180 days of conditional certification
3-point requirements Yes. with conditions Must close within 180 days of conditional certification
5-point requirements No Must be fully implemented at assessment time
CUI protection requirements No Must be fully implemented at assessment time

1TEN flags non-deferrable requirements in the Requirements Browser and POA&M Tracker so your team knows which gaps require immediate remediation versus which can be managed through the 180-day closeout process.

Why defense contractors choose 1TEN for POA&M management

Generic POA&M templates and standalone trackers create a documentation problem: your POA&M is disconnected from your actual assessment data. When your C3PAO asks to verify a closed item, you're manually cross-referencing spreadsheets instead of pointing to linked evidence.

What makes 1TEN different
Auto-populated from live assessment data. No manual entry of practice IDs or descriptions. POA&M items are created directly from Not Met determinations in the Requirements Browser. the data is already there.
SPRS score impact visible per item. Every POA&M entry shows the point deduction it represents. Prioritize by impact, not by volume. close the 5-point items first.
Projected score trajectory built in. Assign due dates to open items and the SPRS Score Analysis report projects your score at each milestone. Know your certification number before you submit to SPRS.
Air-gapped, on-premises deployment. Your POA&M contains detailed descriptions of every security gap in your organization. That data stays on your appliance. not in a cloud SaaS platform accessible from outside your network.

Modules that work with POA&M Tracker

The POA&M Tracker is fed by the Requirements Browser and feeds the SPRS Score Analysis. every module shares the same underlying data so nothing requires manual synchronization.

See your projected SPRS score before you schedule your C3PAO.

30 minutes on a live 1TEN appliance. We'll show you how POA&M items auto-populate from your assessment data and how the score trajectory report works with your actual gaps.

Request a demo