Guides, regulatory breakdowns, and assessment readiness resources for defense contractors.
Last updated October 12, 2026
On July 13, 2026 the Department of War suspended CMMC Phase 2 and opened a 60-day review. DFARS 7012, NIST 800-171, and SPRS still apply. What to do.
Read the article →New guides, regulatory breakdowns, and assessment readiness updates, delivered when we publish. No noise.
Firmware, circuit designs, and test specifications for defense electronics and sensors are CUI. A practical guide to CMMC scope boundaries in this sector.
Read the guide →Weapons and munitions manufacturers merge physical security with digital compliance like no other sector. A practical guide to CMMC scope in production.
Read the guide →Naval architecture drawings, ship repair specs, and combat systems documentation create distinct CMMC scoping challenges. A guide for maritime suppliers.
Read the guide →Maintenance records, technical manuals, and repair specs for active defense platforms are among the toughest CMMC scoping challenges. A guide for MRO firms.
Read the guide →Prime flow-down audits are happening now, and sub-tier ground vehicle suppliers face CMMC obligations they may not have accepted. A guide to flow-down.
Read the guide →Technical drawings, CNC programs, and inspection records: a practical guide to identifying CUI scope for aerospace and defense manufacturers under CMMC Level 2.
Read the guide →1TEN is an air-gapped, on-premises GRC platform engineered for defense contractors handling CUI.
Schedule a Platform Tour